PluginBench
Skill
Review
Audit score 70

risk-management-specialist

alirezarezvani/claude-skills

How to install risk-management-specialist

npx skills add https://github.com/alirezarezvani/claude-skills --skill risk-management-specialist
Claude Code
Cursor
Windsurf
Cline
Full instructions (SKILL.md)

Source of truth, from alirezarezvani/claude-skills.


name: "risk-management-specialist" description: Medical device risk management specialist implementing ISO 14971 throughout product lifecycle. Provides risk analysis, risk evaluation, risk control, and post-production information analysis. Use when user mentions risk management, ISO 14971, risk analysis, FMEA, fault tree analysis, hazard identification, risk control, risk matrix, benefit-risk analysis, residual risk, risk acceptability, or post-market risk.

Risk Management Specialist

ISO 14971:2019 risk management implementation throughout the medical device lifecycle.


Table of Contents


Risk Management Planning Workflow

Establish risk management process per ISO 14971.

Workflow: Create Risk Management Plan

  1. Define scope of risk management activities:
    • Medical device identification
    • Lifecycle stages covered
    • Applicable standards and regulations
  2. Establish risk acceptability criteria:
    • Define probability categories (P1-P5)
    • Define severity categories (S1-S5)
    • Create risk matrix with acceptance thresholds
  3. Assign responsibilities:
    • Risk management lead
    • Subject matter experts
    • Approval authorities
  4. Define verification activities:
    • Methods for control verification
    • Acceptance criteria
  5. Plan production and post-production activities:
    • Information sources
    • Review triggers
    • Update procedures
  6. Obtain plan approval
  7. Establish risk management file
  8. Validation: Plan approved; acceptability criteria defined; responsibilities assigned; file established

Risk Management Plan Content

SectionContentEvidence
ScopeDevice and lifecycle coverageScope statement
CriteriaRisk acceptability matrixRisk matrix document
ResponsibilitiesRoles and authoritiesRACI chart
VerificationMethods and acceptanceVerification plan
Production/Post-ProductionMonitoring activitiesSurveillance plan

Risk Acceptability Matrix (5x5)

Probability \ SeverityNegligibleMinorSeriousCriticalCatastrophic
Frequent (P5)MediumHighHighUnacceptableUnacceptable
Probable (P4)MediumMediumHighHighUnacceptable
Occasional (P3)LowMediumMediumHighHigh
Remote (P2)LowLowMediumMediumHigh
Improbable (P1)LowLowLowMediumMedium

Risk Level Actions

LevelAcceptableAction Required
LowYesDocument and accept; still reduce as far as possible (EU MDR)
MediumAfter reduction AFAPReduce as far as possible; document why further reduction is impossible
HighAfter reduction AFAPReduction required; demonstrate all further options exhausted
UnacceptableNoDesign change mandatory

EU MDR — AFAP, not ALARP: For CE-marked devices, risks must be reduced as far as possible (AFAP) without economic considerations (MDR Annex I, GSPR 1–4; EN ISO 14971:2019/A11:2021 Z-annexes deviation). ALARP ("as low as reasonably practicable"), which permits cost-benefit weighing in acceptability decisions, is not an acceptable criterion under the EU MDR — a notified body will flag it. ISO 14971:2019 itself removed ALARP from the normative text. ALARP may persist in some non-EU jurisdictions (e.g., the UK HSE tradition); if used outside the EU, flag the deviation from EU requirements explicitly.


Risk Analysis Workflow

Identify hazards and estimate risks systematically.

Workflow: Conduct Risk Analysis

  1. Define intended use and reasonably foreseeable misuse:
    • Medical indication
    • Patient population
    • User population
    • Use environment
  2. Select analysis method(s):
    • FMEA for component/function analysis
    • FTA for system-level analysis
    • HAZOP for process deviations
    • Use Error Analysis for user interaction
  3. Identify hazards by category:
    • Energy hazards (electrical, mechanical, thermal)
    • Biological hazards (bioburden, biocompatibility)
    • Chemical hazards (residues, leachables)
    • Operational hazards (software, use errors)
  4. Determine hazardous situations:
    • Sequence of events
    • Foreseeable misuse scenarios
    • Single fault conditions
  5. Estimate probability of harm (P1-P5)
  6. Estimate severity of harm (S1-S5)
  7. Document in hazard analysis worksheet
  8. Validation: All hazard categories addressed; all hazards documented; probability and severity assigned

Hazard Categories Checklist

CategoryExamplesAnalyzed
ElectricalShock, burns, interference
MechanicalCrushing, cutting, entrapment
ThermalBurns, tissue damage
RadiationIonizing, non-ionizing
BiologicalInfection, biocompatibility
ChemicalToxicity, irritation
SoftwareIncorrect output, timing
Use ErrorMisuse, perception, cognition
EnvironmentEMC, mechanical stress

Analysis Method Selection

SituationRecommended Method
Component failuresFMEA
System-level failureFTA
Process deviationsHAZOP
User interactionUse Error Analysis
Software behaviorSoftware FMEA
Early design phasePHA

Probability Criteria

LevelNameDescriptionFrequency
P5FrequentExpected to occur>10⁻³
P4ProbableLikely to occur10⁻³ to 10⁻⁴
P3OccasionalMay occur10⁻⁴ to 10⁻⁵
P2RemoteUnlikely10⁻⁵ to 10⁻⁶
P1ImprobableVery unlikely<10⁻⁶

Severity Criteria

LevelNameDescriptionHarm
S5CatastrophicDeathDeath
S4CriticalPermanent impairmentIrreversible injury
S3SeriousInjury requiring interventionReversible injury
S2MinorTemporary discomfortNo treatment needed
S1NegligibleInconvenienceNo injury

See: references/risk-analysis-methods.md


Risk Evaluation Workflow

Evaluate risks against acceptability criteria.

Workflow: Evaluate Identified Risks

  1. Calculate initial risk level from probability × severity
  2. Compare to risk acceptability criteria
  3. For each risk, determine:
    • Acceptable: Document and accept (EU MDR: still reduce as far as possible)
    • Reduction required (AFAP): Proceed to risk control
    • Unacceptable: Mandatory risk control
  4. Document evaluation rationale
  5. Identify risks requiring benefit-risk analysis
  6. Complete benefit-risk analysis if applicable
  7. Compile risk evaluation summary
  8. Validation: All risks evaluated; acceptability determined; rationale documented

Risk Evaluation Decision Tree

Risk Estimated
      │
      ▼
Apply Acceptability Criteria
      │
      ├── Low Risk ──────────► Accept and document
      │
      ├── Medium Risk ───────► Reduce as far as possible (AFAP)
      │   │                    Document why further reduction impossible
      │   ▼
      │   Further reduction possible?
      │   │
      │   Yes──► Implement control
      │   No───► Document AFAP rationale (no economic considerations)
      │
      ├── High Risk ─────────► Risk reduction required
      │   │                    Must demonstrate reduction AFAP
      │   ▼
      │   Implement control
      │   Verify residual risk
      │
      └── Unacceptable ──────► Design change mandatory
                               Cannot proceed without control

AFAP Demonstration Requirements (EU MDR)

CriterionEvidence Required
All control options consideredAnalysis of every feasible control per the hierarchy (design, protective measures, information)
Further reduction impossibleEvidence each remaining option is technically infeasible or does not further reduce risk
State of the artComparison to similar devices and current standards
Stakeholder inputClinical/user perspectives

Economic considerations (cost of further risk reduction) must not enter the EU acceptability decision (MDR Annex I GSPR 2; EN ISO 14971:2019/A11:2021). Cost may inform business decisions about whether to market the device — never whether a risk is acceptable.

Benefit-Risk Analysis Triggers

SituationBenefit-Risk Required
Residual risk remains highYes
No feasible risk reductionYes
Novel deviceYes
Unacceptable risk with clinical benefitYes
All risks lowNo

Risk Control Workflow

Implement and verify risk control measures.

Workflow: Implement Risk Controls

  1. Identify risk control options:
    • Inherent safety by design (Priority 1)
    • Protective measures in device (Priority 2)
    • Information for safety (Priority 3)
  2. Select optimal control following hierarchy
  3. Analyze control for new hazards introduced
  4. Document control in design requirements
  5. Implement control in design
  6. Develop verification protocol
  7. Execute verification and document results
  8. Evaluate residual risk with control in place
  9. Validation: Control implemented; verification passed; residual risk acceptable; no unaddressed new hazards

Risk Control Hierarchy

PriorityControl TypeExamplesEffectiveness
1Inherent SafetyEliminate hazard, fail-safe designHighest
2Protective MeasuresGuards, alarms, automatic shutdownHigh
3InformationWarnings, training, IFULower

Risk Control Option Analysis Template

RISK CONTROL OPTION ANALYSIS

Hazard ID: H-[XXX]
Hazard: [Description]
Initial Risk: P[X] × S[X] = [Level]

OPTIONS CONSIDERED:
| Option | Control Type | New Hazards | Feasibility | Selected |
|--------|--------------|-------------|-------------|----------|
| 1 | [Type] | [Yes/No] | [H/M/L] | [Yes/No] |
| 2 | [Type] | [Yes/No] | [H/M/L] | [Yes/No] |

SELECTED CONTROL: Option [X]
Rationale: [Justification for selection]

IMPLEMENTATION:
- Requirement: [REQ-XXX]
- Design Document: [Reference]

VERIFICATION:
- Method: [Test/Analysis/Review]
- Protocol: [Reference]
- Acceptance Criteria: [Criteria]

Risk Control Verification Methods

MethodWhen to UseEvidence
TestQuantifiable performanceTest report
InspectionPhysical presenceInspection record
AnalysisDesign calculationAnalysis report
ReviewDocumentation checkReview record

Residual Risk Evaluation

After ControlAction
AcceptableDocument, proceed
Reduced AFAPDocument rationale (no economic considerations), proceed
Still unacceptableAdditional control or design change
New hazard introducedAnalyze and control new hazard

Post-Production Risk Management

Monitor and update risk management throughout product lifecycle.

Workflow: Post-Production Risk Monitoring

  1. Identify information sources:
    • Customer complaints
    • Service reports
    • Vigilance/adverse events
    • Literature monitoring
    • Clinical studies
  2. Establish collection procedures
  3. Define review triggers:
    • New hazard identified
    • Increased frequency of known hazard
    • Serious incident
    • Regulatory feedback
  4. Analyze incoming information for risk relevance
  5. Update risk management file as needed
  6. Communicate significant findings
  7. Conduct periodic risk management review
  8. Validation: Information sources monitored; file current; reviews completed per schedule

Information Sources

SourceInformation TypeReview Frequency
ComplaintsUse issues, failuresContinuous
ServiceField failures, repairsMonthly
VigilanceSerious incidentsImmediate
LiteratureSimilar device issuesQuarterly
RegulatoryAuthority feedbackAs received
ClinicalPMCF dataPer plan

Risk Management File Update Triggers

TriggerResponse TimeAction
Serious incidentImmediateFull risk review
New hazard identified30 daysRisk analysis update
Trend increase60 daysTrend analysis
Design changeBefore implementationImpact assessment
Standards updatePer transition periodGap analysis

Periodic Review Requirements

Review ElementFrequency
Risk management file completenessAnnual
Risk control effectivenessAnnual
Post-market information analysisQuarterly
Risk-benefit conclusionsAnnual or on new data

Risk Assessment Templates

→ See references/risk-assessment-templates.md for details

Decision Frameworks

Risk Control Selection

What is the risk level?
        │
        ├── Unacceptable ──► Can hazard be eliminated?
        │                    │
        │                Yes─┴─No
        │                 │     │
        │                 ▼     ▼
        │            Eliminate  Can protective
        │            hazard     measure reduce?
        │                           │
        │                       Yes─┴─No
        │                        │     │
        │                        ▼     ▼
        │                   Add       Add warning
        │                   protection + training
        │
        └── High/Medium ──► Apply hierarchy
                            starting at Level 1

New Hazard Analysis

QuestionIf YesIf No
Does control introduce new hazard?Analyze new hazardProceed
Is new risk higher than original?Reject control optionAcceptable trade-off
Can new hazard be controlled?Add controlReject control option

Risk Acceptability Decision

ConditionDecision
All risks LowAcceptable
Medium risks reduced AFAPAcceptable
High risks reduced AFAP, documentedAcceptable if benefits outweigh
Any Unacceptable residualNot acceptable - redesign

Tools and References

Scripts

ToolPurposeUsage
risk_matrix_calculator.pyCalculate risk levels and FMEA RPNpython risk_matrix_calculator.py --help

Risk Matrix Calculator Features:

  • ISO 14971 5x5 risk matrix calculation
  • FMEA RPN (Risk Priority Number) calculation
  • Interactive mode for guided assessment
  • Display risk criteria definitions
  • JSON output for integration

References

DocumentContent
iso14971-implementation-guide.mdComplete ISO 14971:2019 implementation with templates
risk-analysis-methods.mdFMEA, FTA, HAZOP, Use Error Analysis methods

Quick Reference: ISO 14971 Process

StageKey ActivitiesOutput
PlanningDefine scope, criteria, responsibilitiesRisk Management Plan
AnalysisIdentify hazards, estimate riskHazard Analysis
EvaluationCompare to criteria, AFAP assessment (EU)Risk Evaluation
ControlImplement hierarchy, verifyRisk Control Records
ResidualOverall assessment, benefit-riskRisk Management Report
ProductionMonitor, review, updateUpdated RM File

Related Skills

SkillIntegration Point
quality-manager-qms-iso13485QMS integration
capa-officerRisk-based CAPA
regulatory-affairs-headRegulatory submissions
quality-documentation-managerRisk file management

Related skills

More from alirezarezvani/claude-skills and the wider catalog.

MA

marketing-skills

alirezarezvani/claude-skills

Directory and router for the marketing skills library. Use when you need to find the right marketing skill for a task, see what marketing capabilities exist, or get oriented in this plugin. 44 specialist skills across 8 pods (content, SEO + AEO, CRO, channels, growth, intelligence, sales enablement, ops), 59 stdlib Python tools. Routes to one skill — it does not execute marketing work itself.

2.1k installs
EN

engineering-skills

alirezarezvani/claude-skills

Index of the engineering-team skills bundle for Claude Code, Codex, Gemini CLI, Cursor, OpenClaw, and 6 more tools. Architecture, frontend, backend, QA, DevOps, security, AI/ML, data engineering, Playwright, Stripe, AWS, MS365 (stdlib-only Python tools). Use when browsing or choosing among engineering-team role skills — load only the one specialist SKILL.md you need, never bulk-load the bundle.

2.1k installs
FI

finance-skills

alirezarezvani/claude-skills

Router/index for the 2 finance skills bundled in this plugin: financial-analyst (ratio analysis, DCF valuation, budget variance, rolling forecasts) and saas-metrics-coach (ARR/MRR, churn, CAC/LTV, NRR, quick ratio). Use when a finance request doesn't obviously match one skill and you need to pick the right one (e.g., 'analyze these financials', 'how healthy are my SaaS metrics').

2.1k installs
BU

business-growth-skills

alirezarezvani/claude-skills

Router/index for the 4 business & growth skills bundled in this plugin: customer-success-manager (health scoring, churn risk, expansion), sales-engineer (RFP analysis, competitive matrices, PoC planning), revenue-operations (pipeline, forecast accuracy, GTM efficiency), and contract-and-proposal-writer. Use when a growth/revenue request doesn't obviously match one skill and you need to pick the right one (e.g., 'which accounts are at risk', 'should we bid on this RFP').

2.0k installs
EN

engineering-advanced-skills

alirezarezvani/claude-skills

Index of 37 advanced engineering agent skills for Claude Code, Codex, Gemini CLI, Cursor, OpenClaw. Use when browsing or choosing among the POWERFUL-tier engineering skills: agent design, RAG, MCP servers, CI/CD, database design, observability, security auditing, changelog/release automation, reliability (SLO/chaos/flags/operators), platform ops.

1.9k installs
PR

product-skills

alirezarezvani/claude-skills

Router/index for the 12 product skills bundled in this plugin (RICE prioritization, OKRs, UX research, design tokens, competitive teardown, analytics, experiments, discovery, roadmaps, spec-to-repo, landing pages, SaaS scaffolding). Use when a product request doesn't obviously match one skill and you need to pick the right one (e.g., 'help me prioritize features', 'plan a product experiment').

1.9k installs